Basic information on each coal fired plant world wide is included in the database (see below). In addition all FGD and SCR projects are included. A big effort is being made to document all the activity in China. Each week there are many additions. They first appear in the Utility E Alert and then are added to the database. The following is a sample article from the Alert:
300 MW FGD at Zhuzhou 4 in Operation
Datang Zhuzhou Power plant began operation of a 310 MW FGD system for Unit 4 on October 29, 2006. The FGD contract was awarded to Shanghai Longking Environmental Protection Co. in October of 2005. The FGD system is wet limestone/gypsum technology, which is licensed by Germany LLB Co. The SO2 removal efficiency was measured to be over 98 percent. The suppliers of the main components of the FGD system are as follows: Slurry pumps--Jiangsu Feixiang Pump Manufacture Co., Screw Air compressors--Shanghai Fushi Industry Co., Wet limestone ball milling--Jinan Heavy Industry Co., Adjustable blower--Shanghai Blower Plant Co.
Plant information from Database:
Utility Plans
And Data - Worldwide
Complete Plant Information
Click on a buttons below to view related areas.
Particulate SO2 Control & Emissions Monitoring NOx Control & Emission
plant name: Lambton
unit id: 1
new owner:
utility name: Ontario Power Generation
province: Ontario
country: Canada
coastal/inland:
size MW: 510
future plans: Ontario gov't wants to close by 2007
plant startup: 1969
fuel specific: US eastern bituminous, 2.5-3% sulfur
alternate fuel:
boiler type:
boiler manufacturer: Combustion Engineering
pulverizer supplier:
plant architect:
Individual Stacks:
| year | plant name | unit id | GWh |
| No records returned. | |||
Combined/Multiple Stacks:
| year | plant name | unit id | GWh |
| 1999 Full Year | Lambton | 1 | 9001 |
| 1999 Full Year | Lambton | 2 | 9001 |
| 1999 Full Year | Lambton | 3 | 9001 |
| 1999 Full Year | Lambton | 4 | 9001 |
| 2000 Full Year | Lambton | 1 | 12415 |
| 2000 Full Year | Lambton | 2 | 12415 |
| 2000 Full Year | Lambton | 3 | 12415 |
| 2000 Full Year | Lambton | 4 | 12415 |
| 2001 Full Year | Lambton | 1 | 10472 |
| 2001 Full Year | Lambton | 2 | 10472 |
| 2001 Full Year | Lambton | 3 | 10472 |
| 2001 Full Year | Lambton | 4 | 10472 |
| 2002 Full Year | Lambton | 1 | 10022 |
| 2002 Full Year | Lambton | 2 | 10022 |
| 2002 Full Year | Lambton | 3 | 10022 |
| 2002 Full Year | Lambton | 4 | 10022 |
Particulate:
part original equipment: ESP-cs
part manufacturer:
part temperature:
part air flow Sm3/hr:
part addition:
part addition supplier:
part addition startup:
part addition architect:
part WESP:
part WESP configuration:
part fgc supplier: Wahlco
part fgc startup: 1991
SO2 Control & Emissions:
FGD:
fgd startup: yes
fgd architech:
fgd supplier: Joy-MK (Bischoff design)
fgd licensor:
fgd changes to original:
fgd reagent: limestone
fgd method: wet
fgd waste disposal:
fgd efficiency: 91
fgd scrubber vessel material:
fgd ball mill supplier:
fgd recycle slurry pump supplier:
fgd nozzle supplier: Bete
fgd knife gate valves supplier:
fgd id fans supplier:
fgd dampers supplier:
fgd expansion joints supplier: KE Burgmann
fgd agitator supplier:
fgd air compressor supplier:
fgd dewatering supplier:
fgd dewatering type:
fgd dewatering description:
fgd survivor company:
fgd belt filter supplier:
fgd basket centrifuge supplier:
Individual Stacks:
| year | plant name | unit id | SO2 tonnes | SO2 removal | SO2 inlet concentration |
| No records returned. | |||||
Combined/Multiple Stacks:
| year | plant name | unit id | SO2 tonnes | SO2 removal | SO2 inlet concentration |
| 1999 Full Year | Lambton | 1 | |||
| 1999 Full Year | Lambton | 2 | |||
| 1999 Full Year | Lambton | 3 | |||
| 1999 Full Year | Lambton | 4 | |||
| 2000 Full Year | Lambton | 1 | |||
| 2000 Full Year | Lambton | 2 | |||
| 2000 Full Year | Lambton | 3 | |||
| 2000 Full Year | Lambton | 4 | |||
| 2001 Full Year | Lambton | 1 | |||
| 2001 Full Year | Lambton | 2 | |||
| 2001 Full Year | Lambton | 3 | |||
| 2001 Full Year | Lambton | 4 | |||
| 2002 Full Year | Lambton | 1 | |||
| 2002 Full Year | Lambton | 2 | |||
| 2002 Full Year | Lambton | 3 | |||
| 2002 Full Year | Lambton | 4 |
Monitoring:
CEM:
cem startup:
cem architect:
cem supplier:
cem das supplier:
cem flow supplier:
NOx Control & Emissions:
(In Furnace)
nox burner type: tang
nox if technology: LNB
nox if startup:
nox if architect:
nox if supplier:
Individual Stacks:
| year | plant name | unit id | NOx tonnes |
| No records returned. | |||
Combined/Multiple Stacks:
| year | plant name | unit id | NOx tonnes |
| 1999 Full Year | Lambton | 1 | 12800 |
| 1999 Full Year | Lambton | 2 | 12800 |
| 1999 Full Year | Lambton | 3 | 12800 |
| 1999 Full Year | Lambton | 4 | 12800 |
| 2000 Full Year | Lambton | 1 | 14800 |
| 2000 Full Year | Lambton | 2 | 14800 |
| 2000 Full Year | Lambton | 3 | 14800 |
| 2000 Full Year | Lambton | 4 | 14800 |
| 2001 Full Year | Lambton | 1 | 11800 |
| 2001 Full Year | Lambton | 2 | 11800 |
| 2001 Full Year | Lambton | 3 | 11800 |
| 2001 Full Year | Lambton | 4 | 11800 |
| 2002 Full Year | Lambton | 1 | 9790 |
| 2002 Full Year | Lambton | 2 | 9790 |
| 2002 Full Year | Lambton | 3 | 9790 |
| 2002 Full Year | Lambton | 4 | 9790 |
(Post Combustion)
nox pc technology:
nox pc efficiency:
nox pc startup:
nox pc architect:
nox pc supplier:
nox pc catalyst supplier:
nox pc ammonia type:
nox pc ammonia supplier:
nox pc cem supplier:
nox pc injection system supplier:
nox pc dampers supplier:
nox pc mechanical contractor:
nox pc expansion joints suppliers: