FGD
and DeNOx
NEWSLETTER
April 2009
No. 372
For a printer friendly copy of this newsletter
CLICK HERE
Table of Contents
FGD
Revised Air Permit for Big Stone II
Israel Electric FGD Delay; Will Switch to Low Sulfur Coal
Selip Spray Headers for Two FGD Systems in SC
Emcor to Install FGD Piping at Brandon Shores
FGD Reagents Hot Topic Hour on March 5
Atlac Resin for Duct at Tusimice FGD
SO2 Reductions Ahead of Acid Rain Schedule
Emissions Reduction Equipment on Refineries in KS and WY
Hanwei/Ershigs Joint Venture in China
AIRPOL 2009 in June in Detroit
Cliffside 6 Integrated Emissions Control System
Design of a Modern Dry FGD System
The Role of Lime for Integrated Industrial Emissions Control Solutions
FGD Gypsum Can Be Used to Improve Soil Chemical and Physical Properties
Back to FGD and DeNOx
Newsletter No. 372
Table
of Contents