LNG REGASIFICATION IMPORT TERMINALS WORLDWIDE
AMERICAS
Facility Location Status Capacity Owner Construction/Engineering  Storage Tanks Miscellaneous
Elba Island, GA Onshore, US Existing/1978 0.68 Bcfd Southern LNG El Paso Corp three storage tanks Reopened 2002, FERC okayed expansion order April 2003 for fourth cryogenic tank, Planned Expansion, 2006 , (2.100 Bcfd)
Everett, MA Onshore, US Existing/1971 1.035 Bcfd Distrigas/SUEZ, Tractebel Cabot LNG, Tractebel two tanks, total 3.4 Bcf  
Cove Point, MD Onshore, US Existing/1978 1.0 Bcfd Dominion CNG, Columbia Corp. original storage capacity 5 Bcf Reopened 2003, Planned Expansion, 2005, 2008, (to 1.800 Bcfd) 2.8 Bcf LNG storage tank added
Gulf Gateway, Gulf of Mexico, LA  Offshore, US Existing/2005  0.5 Bcfd Energy Bridge LLC/Excelerate Energy Excelerate Energy, APL    
Trunkline LNG, Lake Charles, LA Onshore, US Existing/1981  1.0 Bcfd Southern Union, Trunkline LNG Trunkline LNG 9 Bcf, four tanks w/expansion Reopened 1989, Planned Expansion, 2005, 2007, (2.100 Bcfd)
 
Suape, Brazil Onshore, Brazil Proposed   Shell, Petrobras     Project may be revived after having been shelved
Bay of Quinteros, Chile Onshore, Chile Proposed/Startup 2009   Empressa Nacional del Petroleo (ENAP)     ENAP plans to start construction by late 2005 or early 2006
Guaynilla Bay, Peñuelas, PR Onshore, Puerto Rico Existing/2000  186 MMcfd EcoElectrica/Edison Mission Energy, Gas Natural EcoElectrica, L.P. (Enron Development, Kenetech Energy)  two 1 mln barrel tanks  
Los Mina, Andres, DR Onshore, Dominican Republic Existing/2003  97 Bcfy AES Corp CB&I one tank 160,000 cubic meters  
 
Ocean Express, Ocean Cay, Bahamas Onshore, Bahamas Proposed/Startup 2008+ 0.84 Bcfd AES Ocean LNG, Ltd. AES Ocean LNG, Ltd.   Pipeline to FL approved by FERC Jan 2004, application before Bahamian Government
Bear Head, Point Tupper, Nova Scotia Onshore, Canada Proposed/Startup 2008+ 1.0 Bcfd Anadarko Canada Corp Anadarko Canada Corp two LNG storage tanks Granted environmental approval by Canadian and Provincial govts, major construction set for 2005. Phase II set to increase to 1.5 Bcfd 
Cacouna Energy, Gros Cahouna, QC  Onshore, Canada Proposed/Startup 2009 0.5 Bcfd Trans Canada/ Petro Canada   two 160,000 cubic meters tanks Environmental Impact Stmt. filed with Canadian authorities, May 2005, Regulatory review process should be complete in late 2006
Canaport, St John, New Brunswick Onshore, Canada Proposed/Startup 2008 1.0 Bcfd Irving Oil Canaport LNG/Irving Oil Ltd. and Repsol YPF SA  three 160,000 cubic meters tanks Approved by Canadian and Provincial Govts, 2004, EPC contract awarded
Keltic LNG, Goldboro, NS Onshore, Canada Proposed/Startup 2010 1.9 Bcfd Keltic Petrochemicals     Integrated LNG petrochemical and co-gen project
Kitimat LNG, Emsley Cove, BC Onshore, Canada Proposed/Startup 2008 0.61 Bcfd Kitimat LNG /Galveston LNG   two 160,000 cubic meters LNG  tanks, possible future third tank Application filed w/Canadian authorities (EAO) Aug 2004
Project Rabaska, Quebec City, QC Onshore, Canada Proposed/Startup 2009 0.5 Bcfd Enbridge/ Gaz Met/Gaz de France   two 160,000 cubic meters  tanks Project announced Feb 2005, Pending at Canadian and Provincial agencies
WestPac LNG, Ridley Island, BC Onshore, Canada Proposed/Startup 2009 0.30 Bcfd WetPac Terminals   one tank, 160,000-180,000 cubic meters WestPac to begin regulatory and environmental approval process 2005
Caylpso, Freeport, Grand Bahama Is Onshore, Grand Bahama Is. Proposed/Startup 2007+ 0.83 Bcfd Tractabel Bahamas LNG Calypso U.S. Pipeline LLC/Suez North America   Pipeline to FL approved by FERC Mar 2004, awaiting environmental approval
High Rock LNG/ Seafarer, Grand Bahama Is Onshore, Grand Bahama Is. Proposed/Startup 2008 1.0 Bcfd El Paso Corp/Tractabel     Prefiling Underway w/FERC to connect Seafarer Pipeline to FL, Terminal Pending in Bahamas, Dec 2004 agreement to link to Calypso project 
Altamira, Tamulipas, MX Onshore, Mexico Proposed/Startup 2006 0.7 Bcfd Shell/Total/Mitsui Union Fenosa (Spain) two 150,000 cubic meters tanks Approved by Mexico May 2003, No US supply but reduce US exports to Mexico
Baha California, coast off Tijuana MX Offshore, Mexico Proposed/Startup 2007+ 0.75 Bcfd Chevron Texaco Aker Kvaerner and Fluor   Filed permit applications w/Mexican regulatory and environmental authorities 2003, Semarnat environmental approval 2003
Baha, CA (Energeria Costa Azul) Onshore, Mexico Proposed/Startup 2008 1.0 Bcfd Sempra/Shell   two 160,000 cubic meters, space for two add. tanks Under construction, Approved by Mexican  Authorities 2004 /after 2003 procedural protest
Baha, CA (GNL Mar Adentro) Offshore, Mexico Proposed/Startup 2009 1.4 Bcfd Chevron Texaco   LNG storage capacity: 250,000 cubic meters Filed w/Mexican Regulators 2003, Federal permit to construct received Jan 2005 
HiLoad  LNG, Gulf of Mexico Offshore, Mexico Proposed/Startup 2008 1.3 Bcfd Dorado /Tidelands Remora Technology/HiTecVision AS Proposed underground storage facility  
Lazaro Cardenas, MX Onshore, Mexico Proposed/Startup 2008+ 0.5 Bcfd Tractabel/Repsol     Pending at Mexican Regulatory Agencies, Process of acquiring site, talks underway with Pemex
Manzanillo, Port of Manzanillo, MX Onshore, Mexico Proposed/Startup 2009 0.5 Bcfd Comision Federal de Electricidad       
Sonora Pacific, Puerto Libertad, MX Onshore, Mexico Proposed/Startup 2008+ 1.3 Bcfd Sonora Pacific LNG/El Paso, DKRW Energy LLC   two 160,000 cubic meters  tanks Cooperation agrmnt. signed w/Sonora State, Mexico May 2004, needs other approvals and permits from Mex authorities
Topolobampo, Sinaloa MX Onshore, Mexico Proposed 0.5 Bcfd (?) not determined      
Compass Port, Mobile, AL Offshore, US Proposed/Startup 2010-2011 1.0 Bcfd ConocoPhillips   two storage tanks, 300,000 cubic meters  Filed w/Coast Guard April 2004, Governors of 3 states offer strong opposition to "Open Loop" style of LNG processing
Cabrillo Port, Oxnard, CA Offshore, US Proposed/Startup 2009-1010 1.5 Bcfd BHP Billiton   three tanks, 273,000 cubic meters Coast Guard accepted application 2004, Request for add. Info from USCG/MARAD may delay decision til  2006
Clearwater Port, Oxnard, CA Offshore, US Proposed/Startup 2009-1010 0.5 Bcfd Crystal Energy     Filed w/Coast Guard 2004, MARAD, Coast Guard ruled application incomplete
Long Beach, CA Onshore, US Proposed/Startup 2009-2010 0.7 Bcfd Sound Energy Solutions/ ConocoPhillips, Mitsubishi    two 160,000 cubic meters storage tanks Filed at FERC Feb 2004, Public hearings Nov, 2005, Delayed pending Public Utilities Commission Appeal
Beacon Port, Gulf of Mexico, LA Offshore, US Proposed/Startup 2010+ 1.5 Bcfd ConocoPhillips     Filed w/Coast Guard Jan 2005, Construction could begin late 2006
Cameron LNG, Hackberry, LA Onshore, US Proposed/Startup 2008 1.5 Bcfd Sempra Energy Aker Kvaerner/IHI Consortium   Approved by FERC Sept 2003
Creole Trail LNG, Cameron, LA Onshore, US Proposed/Startup 2009 3.3 Bcfd Cheniere LNG   four 160,000 cubic meters LNG storage tanks Prefiled w/FERC Jan 2005
Gulf Landing, W Cameron LA Offshore, US Proposed/Startup 2009 1.0 Bcfd Shell     Coast Guard accepted application Jan 2004, approved March 2005
Main Pass, Gulf of Mexico, LA Offshore, US Proposed/Startup 2009 1.0 Bcfd McMoRan   28 Bcf salt dome natural gas storage facility Filed w/Coast Guard March 2004, FERC working on DEIS
Pearl Crossing, Gulf of Mexico, LA Offshore, US Proposed/Startup 2010-2011 2.8 Bcfd ExxonMobil   two storage tanks, 125,000 cubic meters each Filed w/Coast Guard May 2004, expansion capability to 2 Bcfd
Port Pelican, LA Offshore, US Proposed/Cancelled 1.6 Bcfd Chevron, Texaco     License approved by MARAD 2003, Cancelled Sept 2005
Sabine Pass, LA Onshore, US Proposed/Startup 2008 2.6 Bcfd Cheniere Shiner Moseley three 160,000 cubic meters tanks FERC issued authorization Dec 2004, In construction, startup winter 2007/2008, Expansion planned to 4 Bcfd
Brayton Point LNG, Somerset, MA Onshore, US Proposed 0.65 Bcfd Somerset LNG     Announced July 2003
Neptune LNG, Boston, MA Offshore, US Proposed/Startup 2010 0.4 Bcfd Neptune LNG LLC /Tractabel     Application w/ Coast Guard deemed complete October 2005
Northeast Gateway, Gloucester, MA Offshore, US Proposed/Startup 2007 0.8 Bcfd Energy Bridge LLC/Excelerate Energy     Fil;ed w/Coast Guard & MARAD
Weaver's Cove, Fall River, MA Onshore, US Proposed/Startup 2009 0.8 Bcfd Weaver's Cove Energy, Poten & Partners/Amerada Hess   storage capacity for 4.4 Bcf Conditionally approved by FERC June 2005, Local opposition, but favorable draft enviro. impact stmt from FERC, Aug 2004
Downeast LNG, Robbinston, ME Onshore, US Proposed 0.5 Bcfd Kestrel Energy/Dean Girdis   One or two 160,000 cubic meters tanks Not yet filed
Quoddy Bay, Point Pleasant, ME Onshore, US Proposed/Startup 2008 0.5 Bcfd Quoddy Bay LLC   two LNG storage tanks Intent to file w/ FERC Dec 2004
Casotte Landing, Pascagoula, MS Onshore, US Proposed 1.3 Bcfd Bayou Casotte Energy LLC, Chevron   three 160,000 cubic meters LNG storage tanks  Permit Approval w/ FERC March 2005
Gulf Landing, Pascagoula, MS Offshore, US Proposed/Startup 2010-2011 1.0 Bcfd Gulf LNG Energy LLC, Shell US Gas & Power LLC     Pending w/ Coast Guard/ MARAD, Applied 1/04
Crown Landing, Logan Township, NJ Onshore, US Proposed/Startup 2009-2010 1.2 Bcfd Crown Landing LNG, BP     Prefiling underway at FERC, Ferc working on DEIS
Broadwater Energy, LI Sound NY Offshore, US Proposed/Startup 2010+ 1.0 Bcfd TransCanada Corp/Shell US Gas & Power LLC     FERC and USCG in process of evaluating Aug 2005/Environmental Impact Statement
Jordan Cove Energy Project, Coos Bay, OR Onshore, US Proposed/Startup 2008 0.13 Bcfd Energy Projects Development   two full containment LNG storage tanks Prefiled w/FERC Feb 2005
Northern Star LNG, Bradwood OR Onshore, US Proposed/Startup 2010 1.0 Bcfd Northern Star Natural Gas LLC   two 165,000 cubic meters LNG  tanks, possible future third tank Prefiled w/FERC March 2005
Port Westward LNG, Clatskanie, OR  Onshore, US Proposed 0.7 Bcfd Port Westweard LNG LLC     Prefiling request denied by FERC, April 2005, Request for more information
Skipanon LNG, Warrenton OR Onshore, US Proposed/Startup 2010 1.0 Bcfd Calpine Corp.   two 158,987 cubic meters tanks N/A
Freedom Energy Ctr, Philadelphia, PA Onshore, US Proposed 0.6 Bcfd Philadelphia Gas Works   two tanks holding 4.1 Bcf of gas Turn existing 1970's LNG plant into LNG terminal, largest peak shaving LNG plant in US
Key Span LNG, Providence, RI Onshore, US Proposed/Startup 2009-2010 0.525 Bcfd Key Span, BG Group     Filed w/FERC April 2004 to convert existing 600,000 bbl storage terminal, Future uncertain pending Keyspan/ FERC lawsuit
Bay Crossing, Pelican Island, Galveston, TX Onshore, US Proposed/Startup 2009 1.2 Bcfd BP     Plan to file w/FERC in 2005,  Awaiting outcome of lawsuit Sept,2005
Calhoun LNG, Port Lavaca, TX  Onshore, US Proposed/Startup 2009 1.0 Bcfd Gulf Coast LNG Partners, L.P.   two 3.5 Bcf LNGstorage tanks Application to Construct pending at FERC, March 2005, two
Corpus Christi, TX Onshore, US Proposed/Startup 2008+ 2.6 Bcfd Cheniere/BPU Shiner Moseley three 160,000 cubic meters storage tanks FERC Issued authorization April 2005, Passed FERC Final Environmental Impact Statement
Freeport LNG, Freeport, TX Onshore, US Proposed/Startup 2009 1.5 Bcfd Michael Smith, ConocoPhillips, Cheniere,Contango Fugro South/Technip/ Shiner Moseley/Mustang   FERC Issued authorization June 2004, In construction, Expansion permit pending
Golden Pass, Sabine TX Onshore, US Proposed/Startup 2009 1.0 Bcfd ExxonMobil     FERC Issued authorization July 2005, Proposed startup 2007-2008
Ingleside Energy, Ingleside, TX Onshore, US Proposed/Startup 2008+ 1.0 Bcfd Occidental Energy   two LNG  tanks FERC isuued authorization, July, 2005, Passed DEIS
Port Arthur, TX (Phase I) Onshore, US Proposed/Startup 2009-2010 1.5 Bcfd Sempra   three tanks, 160,000 cubic meters each Prefiling Underway w/FERC, Public comment extended to Dec 2005
Port Arthur, TX (Phase II) Onshore, US Proposed 1.5 Bcfd Sempra   three tanks, 160,000 cubic meters each  
Vista del Sol, Quintana Is,TX Onshore, US Proposed/Startup 2008+ 1.0 Bcfd ExxonMobil     FERC issued Authorization June 2005
EUROPE
Zeebrugge, Belgium Europe Existing/1987 233.8 Bcfy Fluxys LNG, Exxon Mobil   three tanks, 261,000 cubic meters  
Zeebrugge, Belgium (expansion) Europe Proposed/Startup 2007   Fluxys LNG, Exxon Mobil   one tank, 140,000 cubic meters  
Fos Cavaou, France Europe Proposed/Startup 2007   Gaz de France, Total   three tanks, 110,000 cubic meters each  
Fos Tonkin, Fos-sur-Mer, France Europe Existing/1972 285 Bcfy Gaz de France   three cryogenic tanks, 120,000 cubic meters Revamped 1995-2000, Third terminal under construction at Fos-sur-Mer, commissioning in 2007
Montoir-de-Bretagne, France Europe Existing/1980 402 Bcfy Gaz de France   three cryogenic tanks, 360,000 cubic meters  
Wilhelmshaven, Germany Europe Proposed 10 Bcfy E.ON Ruhrgas      
Revithoussa, Greece Europe Existing/2000 93 Bcfy DEPA   two tanks, 130,000 cubic meters Expansion 2007
Brindisi, Italy Phase I Europe Proposed/Startup 2007 146.1 Bcfy Brindisi LNG, BG/ENEL   two tanks, 160,000 cubic meters each  
Brindisi, Italy Phase II (expansion) Europe Proposed/Startup 2010-2012   Brindisi LNG, BG/ENEL   two tanks, 160,000 cubic meters each  
Livorno, Italy Offshore, Europe Proposed/Startup 2008 97.4 Bcfy Cross Energy/Golar LNG     Application reviewed in April 2005
Panigaglia, Italy Europe Existing/1971 130 Bcfy GNL Italia, SNAM Rete Gas   two tanks, 100,000 cubic meters  
Rosignano Marittomo, Italy Europe Proposed/Startup 2007+ 146.1 Bcfy Edison SpA, BP      
Rovigo, North Adriatic, Italy Offshore, Europe Proposed/Startup 2007 146.1 Bcfy Edison SpA, ExxonMobil/Edison   two tanks, 125,000 cubic meters  
Eemshaven or Rotterdam, Netherlands Europe Proposed/Startup (?)   Gasunie, Vopak      
Sines, Portugal Europe Existing/2003 146 Bcfy Galp Atlantico, Galp Energia   two tanks, 240,000 cubic meters  
Sines, Portugal (expansion) Europe Proposed/Startup 2007+   Galp Atlantico, Galp Energia   one tank, 140,000 cubic meters  
Siracusa, Siciliy Europe Proposed/Startup -2010 282.4 Bcfy Shell, ERG Power      
Barcelona, Spain Europe Existing/1970 311 Bcfy Enagas   four tanks, 240,000 cubic meters  
Barcelona, Spain (expansion) Europe Proposed/Startup 2005 58.4 Bcfy Enagas   one tank, 127,000 cubic meters  
Barcelona, Spain (second expansion) Europe Proposed   Enagas   one tank, 150,000 cubic meters  
Huelva, Spain Europe Existing/1988 141 Bcfy Enagas   one tank, 60,000 cubic meters  
Huelva, Spain (expansion) Europe Proposed/Startup 2005 141.2 Bcfy Enagas   two tanks, 150,000 cubic meters each  
Cartagena, Spain Europe Existing/1989 131 Bcfy Enagas   two tanks, 160,000 cubic meters  
Cartagena, Spain (expansion) Europe Proposed/Startup 2005-2007 48.7 Bcfy Enagas   one tank, 1270,000 cubic meters  
Cartagena, Spain (second expansion) Europe Proposed/Startup 2007+   Enagas   one tank, 150,000 cubic meters  
Bilbao, Spain Europe Existing/2003 131 Bcfy Bahia de Bizkaia Gas, Repsol, BPAmoco, Iberdrola, EVE   two tanks, 300,000 cubic meters, space provided for a future third tank  
El Ferrol, Spain Europe Proposed/Startup 2006-2007 97.4 Bcfy Reganosa (Union Fenosa, Endesa, Tojeiro, Sonatrach)   two tanks, 150,000 cubic meters each  
Sagunto, Spain Europe Proposed/Startup 2006-2007 180.2 Bcfy Union Fenosa, Iberola, Edesa SENER, DYWIDAG, TKK, OGE (Osaka Gas Eng.) two tanks, 150,000 cubic meters each  
Sagunto, Spain (expansion) Europe Proposed   Union Fenosa, Iberola, Edesa   two tanks, 150,000 cubic meters each  
Aliaga (Izmir), Turkey  Europe Existing/2003 146.1 Bcfy Egegaz   two tanks, 280,000 cubic meters  
Marmara Ereglisi, Turkey Europe Existing/1994 224 Bcfy Botas   three tanks, 255,000 cubic meters  
Angelsey LNG, Wales Europe Proposed/Startup 2009 20 Bcmy Canatex Energy Ventures     Build on existing chemical works
Canvey Island, Essex, United Kingdom Europe Proposed/Startup 2009 190 Bcfy Calor Gas Ltd   two LNG storage tanks Subject to planning approval, this "Brownfield" project on site of old Calor Gas LPG Terminal could see construction by end of 2006 
Isle of Grain, United Kingdom Europe Existing/2005 160.7 Bcfy Grain LNG Limited/National Grid   four tanks, 50,000 cubic meters each Conversion from peak-shaving plant by Whessoe, BP/Sonatrach have contracted for all the capacity
Isle of Grain, United Kingdom (expansion) Europe Proposed/Startup 2007-2008 477.2 Bcfy Grain LNG Limited/National Grid   three tanks, 190,000 cubic meters each Expansion plans confirmed March 2005
Milford Haven (Phase I), Wales Europe Proposed/Startup 2007 365.3 Bcfy South Hook LNG/ExxonMobil/Quatar Petroleum    three tanks, 155,000 cubic meters  
Milford Haven (Phase I), Wales Europe Proposed/Startup 2007 331.2 Bcfy Dragon LNG/BG,Petronas/Petroplus   two tanks, 168,000 cubic meters each  
Milford Haven (Phase II), Wales Europe Proposed/Startup 2008-2009 365.3 Bcfy South Hook LNG/ExxonMobil  CB&I (Phase II) two tanks, 155,000 cubic meters  
Milford Haven (Phase II), Wales Europe Proposed   Dragon LNG/BG,Petronas,Petroplus   one tank, 168,000 cubic meters each  
ASIA
Guandong, China Asia Proposed/Startup 2006-2007 158.3 Bcfy Guangdong LNG (CNOOC, BP)   two tanks, 160,000 cubic meters each will add third LNG tank for expansion (2008)
Fujian, China Asia Proposed/Startup -2007 126.6 Bcfy CNOOC Fujian LNG CB&I two tanks, 160,000 cubic meters each proposed expansion 2010
Quingdao, Shandong China  Asia Proposed/Startup 2008   Sinopec     Sinopec won government tender for the site in May 2004
Shanghai Asia Proposed/Startup 2008   CNOOC, Shenergy      
Dabhol, India Asia Proposed/2006 (?) 122 Bcfy Gail India Ltd, GE, Bechtel Aker Kvaerner three tanks, 160,000 cubic meters each Proposed  restart after 2001 shutdown following collapse of Enron
Dahej (Gujarat), India Asia Existing/2003 243.5 Bcfy Petronet LNG Ltd (IOC, ONGC, GAIL, Bahrat, NTPC, Gaz de France)   two tanks, 320,000 cubic meters, to be reevaluated for additional storage capacity  
Hazira, India Asia Existing/2005 126.6 Bcfy Shell, Total   two tanks Online April 2005, 2.5 million tons per year with goal to expand to 5 mtpy
Kochi, India Asia Proposed/Startup -2009 121.8 Bcfy Petronet LNG Ltd   Can reevaluated for additional storage capacity Construction to start 2005
West Java, Indonesia Asia Proposed/Startup -2007-2008 97.4 Bcfy BP, Pertamina   two tanks, 118,000 cubic meters each Construction to start 2005
Chita LNG, Japan Asia Existing/1983 584 Bcfy Chita LNG (Chubu Electric, Toho Gas)   seven tanks, 640,000 cubic meters  
Chita Midorihama, Japan Asia Existing/2001   Toho Gas   one tank, 200,000 cubic meters  
Chita, Kyodo, Japan Asia Existing/1977 387 Bcfy Chita LNG (Chubu Electric, Toho Gas)   four tanks, 300,000 cubic meters  
Fukuoka, Japan Asia Existing/1993 31 Bcfy Saibu Gas   two tanks, 70,000 cubic meters  
Futtsu, Japan Asia Existing/1985 779 Bcfy Tokyo Electric   eight tanks, 860,000 cubic meters  
Higashi Niigata, Japan Asia Existing/1984 830 Bcfy Tohoku Electric   eight tanks, 720,000 cubic meters  
Hatsukaichi, Japan Asia Existing/1996 18 Bcfy Hiroshima Gas   one tank, 170,000 cubic meters  
Higashi Ohgishima, Japan Asia Existing/1984 714 Bcfy Tokyo Electric   nine tanks, 540,000 cubic meters  
Himeji Joint, Japan Asia Existing/1984 195 Bcfy Osaka Gas, Kansai Electric   seven tanks, 1,440,000 cubic meters  
Himeji, Japan Asia Existing/1977 402 Bcfy Osaka Gas   seven tanks, 520,000  cubic meters  
Kagoshima, Japan Asia Existing/1996 6 Bcfy Kagoshima Gas   one tanks, 36,000 cubic meters  
Kawagoe, Japan Asia Existing/1997 374 Bcfy Chubu Electric   four tanks, 480,000 cubic meters  
Mizushima, Japan Asia Proposed/2006   Chugoku Electric, Mitsubishi      
Negishi, Japan Asia Existing/1969 662 Bcfy Tokyo Gas, Tokyo Electric   sixteen tanks, 1,250,000 cubic meters  
Ohgishima, Japan Asia Existing/1998 247 Bcfy Tokyo Gas   three tanks, 600,000 cubic meters  
Ohita, Japan Asia Existing/1990 247 Bcfy Ohita LNG (Kyushu Electric, Kyushu Oil, Ohita Gas)   five tanks, 460,000 cubic meters  
Sakai, Japan Asia Proposed/2010   Kansai Electric, Cosmo Oil      
Senboku I, Japan Asia Existing/1972 119 Bcfy Osaka Gas   four tanks, 180,000 cubic meters  
Senboku II, Japan Asia Existing/1972 636 Bcfy Osaka Gas   eighteen tanks, 1,510,000 cubic meters  
Shin Minato, Japan Asia Existing/1997 389 Bcfy Sendai Gas   one tank, 80,000 cubic meters Capacity substantially exceeds current contracted supply
Sodegaura, Japan Asia Existing/1973 1350 Bcfy Tokyo Electric, Tokyo Gas   thirty-five tanks, 2,660,000 cubic meters  
Sodeshi, Japan Asia Existing/1996 311 Bcfy Shimizu LNG (Shizouka Gas)   two tanks, 177,200 cubic meters Capacity substantially exceeds current contracted supply
Tobata, Japan Asia Existing/1997 311 Bcfy Kita Kyushu LNG (Kyushu Electric, Nippon Steel)   eight tanks, 480,000 cubic meters  
Yanai, Japan Asia Existing/1990 117 Bcfy Chuboku Electric   six tanks, 480,000 cubic meters  
Yokkaichi LNG Centre, Japan Asia Existing/1987 428 Bcfy Toho Gas   four tanks, 320,000 cubic meters  
Yokkaichi Works, Japan  Asia Existing/1991 31 Bcfy Chubu Electric   two tanks, 160,000 cubic meters  
Mariveles, Bataan, Philippines Asia Proposed/Startup -2007-2008  68.2 Bcfy GN Power      
Kwangyang, South Korea Asia Existing/2005 82.8 Bcfy POSCO, Mitsubishi, Pohang Iron and Steel   two tanks, 200,000 cubic meters  
Incheon, South Korea Asia Existing/1996 1090 Bcfy Kogas    twelve tanks, 1,280,000 cubic meters  
Pyeong Taek, South Korea Asia Existing/1986 649 Bcfy Kogas    ten tanks, I,000,000 cubic meters  
Tongeyong, South Korea Asia Existing/2002 244 Bcfy Kogas    seven tanks, 980,000 cubic meters KGE-Engineering
Yung-An, Taiwan Asia Existing/1990 363 Bcfy CPC   six tanks, 430,000 cubic meters Debottlenecked 2001
New Zealand Asia Proposed/Startup -2010-2011 (?)   Contact Energy, Genesis Power     NZ faces energy gap with loss of Maui gas field by 2007, Marsden Point and Taranaki most likely viable sites, Contact and Genesis ready to proceed w/ next phase of development and securing resource consents