| LNG REGASIFICATION IMPORT TERMINALS WORLDWIDE | |||||||
| AMERICAS | |||||||
| Facility | Location | Status | Capacity | Owner | Construction/Engineering | Storage Tanks | Miscellaneous |
| Elba Island, GA | Onshore, US | Existing/1978 | 0.68 Bcfd | Southern LNG | El Paso Corp | three storage tanks | Reopened 2002, FERC okayed expansion order April 2003 for fourth cryogenic tank, Planned Expansion, 2006 , (2.100 Bcfd) |
| Everett, MA | Onshore, US | Existing/1971 | 1.035 Bcfd | Distrigas/SUEZ, Tractebel | Cabot LNG, Tractebel | two tanks, total 3.4 Bcf | |
| Cove Point, MD | Onshore, US | Existing/1978 | 1.0 Bcfd | Dominion | CNG, Columbia Corp. | original storage capacity 5 Bcf | Reopened 2003, Planned Expansion, 2005, 2008, (to 1.800 Bcfd) 2.8 Bcf LNG storage tank added |
| Gulf Gateway, Gulf of Mexico, LA | Offshore, US | Existing/2005 | 0.5 Bcfd | Energy Bridge LLC/Excelerate Energy | Excelerate Energy, APL | ||
| Trunkline LNG, Lake Charles, LA | Onshore, US | Existing/1981 | 1.0 Bcfd | Southern Union, Trunkline LNG | Trunkline LNG | 9 Bcf, four tanks w/expansion | Reopened 1989, Planned Expansion, 2005, 2007, (2.100 Bcfd) |
| Suape, Brazil | Onshore, Brazil | Proposed | Shell, Petrobras | Project may be revived after having been shelved | |||
| Bay of Quinteros, Chile | Onshore, Chile | Proposed/Startup 2009 | Empressa Nacional del Petroleo (ENAP) | ENAP plans to start construction by late 2005 or early 2006 | |||
| Guaynilla Bay, Peñuelas, PR | Onshore, Puerto Rico | Existing/2000 | 186 MMcfd | EcoElectrica/Edison Mission Energy, Gas Natural | EcoElectrica, L.P. (Enron Development, Kenetech Energy) | two 1 mln barrel tanks | |
| Los Mina, Andres, DR | Onshore, Dominican Republic | Existing/2003 | 97 Bcfy | AES Corp | CB&I | one tank 160,000 cubic meters | |
| Ocean Express, Ocean Cay, Bahamas | Onshore, Bahamas | Proposed/Startup 2008+ | 0.84 Bcfd | AES Ocean LNG, Ltd. | AES Ocean LNG, Ltd. | Pipeline to FL approved by FERC Jan 2004, application before Bahamian Government | |
| Bear Head, Point Tupper, Nova Scotia | Onshore, Canada | Proposed/Startup 2008+ | 1.0 Bcfd | Anadarko Canada Corp | Anadarko Canada Corp | two LNG storage tanks | Granted environmental approval by Canadian and Provincial govts, major construction set for 2005. Phase II set to increase to 1.5 Bcfd |
| Cacouna Energy, Gros Cahouna, QC | Onshore, Canada | Proposed/Startup 2009 | 0.5 Bcfd | Trans Canada/ Petro Canada | two 160,000 cubic meters tanks | Environmental Impact Stmt. filed with Canadian authorities, May 2005, Regulatory review process should be complete in late 2006 | |
| Canaport, St John, New Brunswick | Onshore, Canada | Proposed/Startup 2008 | 1.0 Bcfd | Irving Oil | Canaport LNG/Irving Oil Ltd. and Repsol YPF SA | three 160,000 cubic meters tanks | Approved by Canadian and Provincial Govts, 2004, EPC contract awarded |
| Keltic LNG, Goldboro, NS | Onshore, Canada | Proposed/Startup 2010 | 1.9 Bcfd | Keltic Petrochemicals | Integrated LNG petrochemical and co-gen project | ||
| Kitimat LNG, Emsley Cove, BC | Onshore, Canada | Proposed/Startup 2008 | 0.61 Bcfd | Kitimat LNG /Galveston LNG | two 160,000 cubic meters LNG tanks, possible future third tank | Application filed w/Canadian authorities (EAO) Aug 2004 | |
| Project Rabaska, Quebec City, QC | Onshore, Canada | Proposed/Startup 2009 | 0.5 Bcfd | Enbridge/ Gaz Met/Gaz de France | two 160,000 cubic meters tanks | Project announced Feb 2005, Pending at Canadian and Provincial agencies | |
| WestPac LNG, Ridley Island, BC | Onshore, Canada | Proposed/Startup 2009 | 0.30 Bcfd | WetPac Terminals | one tank, 160,000-180,000 cubic meters | WestPac to begin regulatory and environmental approval process 2005 | |
| Caylpso, Freeport, Grand Bahama Is | Onshore, Grand Bahama Is. | Proposed/Startup 2007+ | 0.83 Bcfd | Tractabel Bahamas LNG | Calypso U.S. Pipeline LLC/Suez North America | Pipeline to FL approved by FERC Mar 2004, awaiting environmental approval | |
| High Rock LNG/ Seafarer, Grand Bahama Is | Onshore, Grand Bahama Is. | Proposed/Startup 2008 | 1.0 Bcfd | El Paso Corp/Tractabel | Prefiling Underway w/FERC to connect Seafarer Pipeline to FL, Terminal Pending in Bahamas, Dec 2004 agreement to link to Calypso project | ||
| Altamira, Tamulipas, MX | Onshore, Mexico | Proposed/Startup 2006 | 0.7 Bcfd | Shell/Total/Mitsui | Union Fenosa (Spain) | two 150,000 cubic meters tanks | Approved by Mexico May 2003, No US supply but reduce US exports to Mexico |
| Baha California, coast off Tijuana MX | Offshore, Mexico | Proposed/Startup 2007+ | 0.75 Bcfd | Chevron Texaco | Aker Kvaerner and Fluor | Filed permit applications w/Mexican regulatory and environmental authorities 2003, Semarnat environmental approval 2003 | |
| Baha, CA (Energeria Costa Azul) | Onshore, Mexico | Proposed/Startup 2008 | 1.0 Bcfd | Sempra/Shell | two 160,000 cubic meters, space for two add. tanks | Under construction, Approved by Mexican Authorities 2004 /after 2003 procedural protest | |
| Baha, CA (GNL Mar Adentro) | Offshore, Mexico | Proposed/Startup 2009 | 1.4 Bcfd | Chevron Texaco | LNG storage capacity: 250,000 cubic meters | Filed w/Mexican Regulators 2003, Federal permit to construct received Jan 2005 | |
| HiLoad LNG, Gulf of Mexico | Offshore, Mexico | Proposed/Startup 2008 | 1.3 Bcfd | Dorado /Tidelands | Remora Technology/HiTecVision AS | Proposed underground storage facility | |
| Lazaro Cardenas, MX | Onshore, Mexico | Proposed/Startup 2008+ | 0.5 Bcfd | Tractabel/Repsol | Pending at Mexican Regulatory Agencies, Process of acquiring site, talks underway with Pemex | ||
| Manzanillo, Port of Manzanillo, MX | Onshore, Mexico | Proposed/Startup 2009 | 0.5 Bcfd | Comision Federal de Electricidad | |||
| Sonora Pacific, Puerto Libertad, MX | Onshore, Mexico | Proposed/Startup 2008+ | 1.3 Bcfd | Sonora Pacific LNG/El Paso, DKRW Energy LLC | two 160,000 cubic meters tanks | Cooperation agrmnt. signed w/Sonora State, Mexico May 2004, needs other approvals and permits from Mex authorities | |
| Topolobampo, Sinaloa MX | Onshore, Mexico | Proposed | 0.5 Bcfd (?) | not determined | |||
| Compass Port, Mobile, AL | Offshore, US | Proposed/Startup 2010-2011 | 1.0 Bcfd | ConocoPhillips | two storage tanks, 300,000 cubic meters | Filed w/Coast Guard April 2004, Governors of 3 states offer strong opposition to "Open Loop" style of LNG processing | |
| Cabrillo Port, Oxnard, CA | Offshore, US | Proposed/Startup 2009-1010 | 1.5 Bcfd | BHP Billiton | three tanks, 273,000 cubic meters | Coast Guard accepted application 2004, Request for add. Info from USCG/MARAD may delay decision til 2006 | |
| Clearwater Port, Oxnard, CA | Offshore, US | Proposed/Startup 2009-1010 | 0.5 Bcfd | Crystal Energy | Filed w/Coast Guard 2004, MARAD, Coast Guard ruled application incomplete | ||
| Long Beach, CA | Onshore, US | Proposed/Startup 2009-2010 | 0.7 Bcfd | Sound Energy Solutions/ ConocoPhillips, Mitsubishi | two 160,000 cubic meters storage tanks | Filed at FERC Feb 2004, Public hearings Nov, 2005, Delayed pending Public Utilities Commission Appeal | |
| Beacon Port, Gulf of Mexico, LA | Offshore, US | Proposed/Startup 2010+ | 1.5 Bcfd | ConocoPhillips | Filed w/Coast Guard Jan 2005, Construction could begin late 2006 | ||
| Cameron LNG, Hackberry, LA | Onshore, US | Proposed/Startup 2008 | 1.5 Bcfd | Sempra Energy | Aker Kvaerner/IHI Consortium | Approved by FERC Sept 2003 | |
| Creole Trail LNG, Cameron, LA | Onshore, US | Proposed/Startup 2009 | 3.3 Bcfd | Cheniere LNG | four 160,000 cubic meters LNG storage tanks | Prefiled w/FERC Jan 2005 | |
| Gulf Landing, W Cameron LA | Offshore, US | Proposed/Startup 2009 | 1.0 Bcfd | Shell | Coast Guard accepted application Jan 2004, approved March 2005 | ||
| Main Pass, Gulf of Mexico, LA | Offshore, US | Proposed/Startup 2009 | 1.0 Bcfd | McMoRan | 28 Bcf salt dome natural gas storage facility | Filed w/Coast Guard March 2004, FERC working on DEIS | |
| Pearl Crossing, Gulf of Mexico, LA | Offshore, US | Proposed/Startup 2010-2011 | 2.8 Bcfd | ExxonMobil | two storage tanks, 125,000 cubic meters each | Filed w/Coast Guard May 2004, expansion capability to 2 Bcfd | |
| Port Pelican, LA | Offshore, US | Proposed/Cancelled | 1.6 Bcfd | Chevron, Texaco | License approved by MARAD 2003, Cancelled Sept 2005 | ||
| Sabine Pass, LA | Onshore, US | Proposed/Startup 2008 | 2.6 Bcfd | Cheniere | Shiner Moseley | three 160,000 cubic meters tanks | FERC issued authorization Dec 2004, In construction, startup winter 2007/2008, Expansion planned to 4 Bcfd |
| Brayton Point LNG, Somerset, MA | Onshore, US | Proposed | 0.65 Bcfd | Somerset LNG | Announced July 2003 | ||
| Neptune LNG, Boston, MA | Offshore, US | Proposed/Startup 2010 | 0.4 Bcfd | Neptune LNG LLC /Tractabel | Application w/ Coast Guard deemed complete October 2005 | ||
| Northeast Gateway, Gloucester, MA | Offshore, US | Proposed/Startup 2007 | 0.8 Bcfd | Energy Bridge LLC/Excelerate Energy | Fil;ed w/Coast Guard & MARAD | ||
| Weaver's Cove, Fall River, MA | Onshore, US | Proposed/Startup 2009 | 0.8 Bcfd | Weaver's Cove Energy, Poten & Partners/Amerada Hess | storage capacity for 4.4 Bcf | Conditionally approved by FERC June 2005, Local opposition, but favorable draft enviro. impact stmt from FERC, Aug 2004 | |
| Downeast LNG, Robbinston, ME | Onshore, US | Proposed | 0.5 Bcfd | Kestrel Energy/Dean Girdis | One or two 160,000 cubic meters tanks | Not yet filed | |
| Quoddy Bay, Point Pleasant, ME | Onshore, US | Proposed/Startup 2008 | 0.5 Bcfd | Quoddy Bay LLC | two LNG storage tanks | Intent to file w/ FERC Dec 2004 | |
| Casotte Landing, Pascagoula, MS | Onshore, US | Proposed | 1.3 Bcfd | Bayou Casotte Energy LLC, Chevron | three 160,000 cubic meters LNG storage tanks | Permit Approval w/ FERC March 2005 | |
| Gulf Landing, Pascagoula, MS | Offshore, US | Proposed/Startup 2010-2011 | 1.0 Bcfd | Gulf LNG Energy LLC, Shell US Gas & Power LLC | Pending w/ Coast Guard/ MARAD, Applied 1/04 | ||
| Crown Landing, Logan Township, NJ | Onshore, US | Proposed/Startup 2009-2010 | 1.2 Bcfd | Crown Landing LNG, BP | Prefiling underway at FERC, Ferc working on DEIS | ||
| Broadwater Energy, LI Sound NY | Offshore, US | Proposed/Startup 2010+ | 1.0 Bcfd | TransCanada Corp/Shell US Gas & Power LLC | FERC and USCG in process of evaluating Aug 2005/Environmental Impact Statement | ||
| Jordan Cove Energy Project, Coos Bay, OR | Onshore, US | Proposed/Startup 2008 | 0.13 Bcfd | Energy Projects Development | two full containment LNG storage tanks | Prefiled w/FERC Feb 2005 | |
| Northern Star LNG, Bradwood OR | Onshore, US | Proposed/Startup 2010 | 1.0 Bcfd | Northern Star Natural Gas LLC | two 165,000 cubic meters LNG tanks, possible future third tank | Prefiled w/FERC March 2005 | |
| Port Westward LNG, Clatskanie, OR | Onshore, US | Proposed | 0.7 Bcfd | Port Westweard LNG LLC | Prefiling request denied by FERC, April 2005, Request for more information | ||
| Skipanon LNG, Warrenton OR | Onshore, US | Proposed/Startup 2010 | 1.0 Bcfd | Calpine Corp. | two 158,987 cubic meters tanks | N/A | |
| Freedom Energy Ctr, Philadelphia, PA | Onshore, US | Proposed | 0.6 Bcfd | Philadelphia Gas Works | two tanks holding 4.1 Bcf of gas | Turn existing 1970's LNG plant into LNG terminal, largest peak shaving LNG plant in US | |
| Key Span LNG, Providence, RI | Onshore, US | Proposed/Startup 2009-2010 | 0.525 Bcfd | Key Span, BG Group | Filed w/FERC April 2004 to convert existing 600,000 bbl storage terminal, Future uncertain pending Keyspan/ FERC lawsuit | ||
| Bay Crossing, Pelican Island, Galveston, TX | Onshore, US | Proposed/Startup 2009 | 1.2 Bcfd | BP | Plan to file w/FERC in 2005, Awaiting outcome of lawsuit Sept,2005 | ||
| Calhoun LNG, Port Lavaca, TX | Onshore, US | Proposed/Startup 2009 | 1.0 Bcfd | Gulf Coast LNG Partners, L.P. | two 3.5 Bcf LNGstorage tanks | Application to Construct pending at FERC, March 2005, two | |
| Corpus Christi, TX | Onshore, US | Proposed/Startup 2008+ | 2.6 Bcfd | Cheniere/BPU | Shiner Moseley | three 160,000 cubic meters storage tanks | FERC Issued authorization April 2005, Passed FERC Final Environmental Impact Statement |
| Freeport LNG, Freeport, TX | Onshore, US | Proposed/Startup 2009 | 1.5 Bcfd | Michael Smith, ConocoPhillips, Cheniere,Contango | Fugro South/Technip/ Shiner Moseley/Mustang | FERC Issued authorization June 2004, In construction, Expansion permit pending | |
| Golden Pass, Sabine TX | Onshore, US | Proposed/Startup 2009 | 1.0 Bcfd | ExxonMobil | FERC Issued authorization July 2005, Proposed startup 2007-2008 | ||
| Ingleside Energy, Ingleside, TX | Onshore, US | Proposed/Startup 2008+ | 1.0 Bcfd | Occidental Energy | two LNG tanks | FERC isuued authorization, July, 2005, Passed DEIS | |
| Port Arthur, TX (Phase I) | Onshore, US | Proposed/Startup 2009-2010 | 1.5 Bcfd | Sempra | three tanks, 160,000 cubic meters each | Prefiling Underway w/FERC, Public comment extended to Dec 2005 | |
| Port Arthur, TX (Phase II) | Onshore, US | Proposed | 1.5 Bcfd | Sempra | three tanks, 160,000 cubic meters each | ||
| Vista del Sol, Quintana Is,TX | Onshore, US | Proposed/Startup 2008+ | 1.0 Bcfd | ExxonMobil | FERC issued Authorization June 2005 | ||
| EUROPE | |||||||
| Zeebrugge, Belgium | Europe | Existing/1987 | 233.8 Bcfy | Fluxys LNG, Exxon Mobil | three tanks, 261,000 cubic meters | ||
| Zeebrugge, Belgium (expansion) | Europe | Proposed/Startup 2007 | Fluxys LNG, Exxon Mobil | one tank, 140,000 cubic meters | |||
| Fos Cavaou, France | Europe | Proposed/Startup 2007 | Gaz de France, Total | three tanks, 110,000 cubic meters each | |||
| Fos Tonkin, Fos-sur-Mer, France | Europe | Existing/1972 | 285 Bcfy | Gaz de France | three cryogenic tanks, 120,000 cubic meters | Revamped 1995-2000, Third terminal under construction at Fos-sur-Mer, commissioning in 2007 | |
| Montoir-de-Bretagne, France | Europe | Existing/1980 | 402 Bcfy | Gaz de France | three cryogenic tanks, 360,000 cubic meters | ||
| Wilhelmshaven, Germany | Europe | Proposed | 10 Bcfy | E.ON Ruhrgas | |||
| Revithoussa, Greece | Europe | Existing/2000 | 93 Bcfy | DEPA | two tanks, 130,000 cubic meters | Expansion 2007 | |
| Brindisi, Italy Phase I | Europe | Proposed/Startup 2007 | 146.1 Bcfy | Brindisi LNG, BG/ENEL | two tanks, 160,000 cubic meters each | ||
| Brindisi, Italy Phase II (expansion) | Europe | Proposed/Startup 2010-2012 | Brindisi LNG, BG/ENEL | two tanks, 160,000 cubic meters each | |||
| Livorno, Italy | Offshore, Europe | Proposed/Startup 2008 | 97.4 Bcfy | Cross Energy/Golar LNG | Application reviewed in April 2005 | ||
| Panigaglia, Italy | Europe | Existing/1971 | 130 Bcfy | GNL Italia, SNAM Rete Gas | two tanks, 100,000 cubic meters | ||
| Rosignano Marittomo, Italy | Europe | Proposed/Startup 2007+ | 146.1 Bcfy | Edison SpA, BP | |||
| Rovigo, North Adriatic, Italy | Offshore, Europe | Proposed/Startup 2007 | 146.1 Bcfy | Edison SpA, ExxonMobil/Edison | two tanks, 125,000 cubic meters | ||
| Eemshaven or Rotterdam, Netherlands | Europe | Proposed/Startup (?) | Gasunie, Vopak | ||||
| Sines, Portugal | Europe | Existing/2003 | 146 Bcfy | Galp Atlantico, Galp Energia | two tanks, 240,000 cubic meters | ||
| Sines, Portugal (expansion) | Europe | Proposed/Startup 2007+ | Galp Atlantico, Galp Energia | one tank, 140,000 cubic meters | |||
| Siracusa, Siciliy | Europe | Proposed/Startup -2010 | 282.4 Bcfy | Shell, ERG Power | |||
| Barcelona, Spain | Europe | Existing/1970 | 311 Bcfy | Enagas | four tanks, 240,000 cubic meters | ||
| Barcelona, Spain (expansion) | Europe | Proposed/Startup 2005 | 58.4 Bcfy | Enagas | one tank, 127,000 cubic meters | ||
| Barcelona, Spain (second expansion) | Europe | Proposed | Enagas | one tank, 150,000 cubic meters | |||
| Huelva, Spain | Europe | Existing/1988 | 141 Bcfy | Enagas | one tank, 60,000 cubic meters | ||
| Huelva, Spain (expansion) | Europe | Proposed/Startup 2005 | 141.2 Bcfy | Enagas | two tanks, 150,000 cubic meters each | ||
| Cartagena, Spain | Europe | Existing/1989 | 131 Bcfy | Enagas | two tanks, 160,000 cubic meters | ||
| Cartagena, Spain (expansion) | Europe | Proposed/Startup 2005-2007 | 48.7 Bcfy | Enagas | one tank, 1270,000 cubic meters | ||
| Cartagena, Spain (second expansion) | Europe | Proposed/Startup 2007+ | Enagas | one tank, 150,000 cubic meters | |||
| Bilbao, Spain | Europe | Existing/2003 | 131 Bcfy | Bahia de Bizkaia Gas, Repsol, BPAmoco, Iberdrola, EVE | two tanks, 300,000 cubic meters, space provided for a future third tank | ||
| El Ferrol, Spain | Europe | Proposed/Startup 2006-2007 | 97.4 Bcfy | Reganosa (Union Fenosa, Endesa, Tojeiro, Sonatrach) | two tanks, 150,000 cubic meters each | ||
| Sagunto, Spain | Europe | Proposed/Startup 2006-2007 | 180.2 Bcfy | Union Fenosa, Iberola, Edesa | SENER, DYWIDAG, TKK, OGE (Osaka Gas Eng.) | two tanks, 150,000 cubic meters each | |
| Sagunto, Spain (expansion) | Europe | Proposed | Union Fenosa, Iberola, Edesa | two tanks, 150,000 cubic meters each | |||
| Aliaga (Izmir), Turkey | Europe | Existing/2003 | 146.1 Bcfy | Egegaz | two tanks, 280,000 cubic meters | ||
| Marmara Ereglisi, Turkey | Europe | Existing/1994 | 224 Bcfy | Botas | three tanks, 255,000 cubic meters | ||
| Angelsey LNG, Wales | Europe | Proposed/Startup 2009 | 20 Bcmy | Canatex Energy Ventures | Build on existing chemical works | ||
| Canvey Island, Essex, United Kingdom | Europe | Proposed/Startup 2009 | 190 Bcfy | Calor Gas Ltd | two LNG storage tanks | Subject to planning approval, this "Brownfield" project on site of old Calor Gas LPG Terminal could see construction by end of 2006 | |
| Isle of Grain, United Kingdom | Europe | Existing/2005 | 160.7 Bcfy | Grain LNG Limited/National Grid | four tanks, 50,000 cubic meters each | Conversion from peak-shaving plant by Whessoe, BP/Sonatrach have contracted for all the capacity | |
| Isle of Grain, United Kingdom (expansion) | Europe | Proposed/Startup 2007-2008 | 477.2 Bcfy | Grain LNG Limited/National Grid | three tanks, 190,000 cubic meters each | Expansion plans confirmed March 2005 | |
| Milford Haven (Phase I), Wales | Europe | Proposed/Startup 2007 | 365.3 Bcfy | South Hook LNG/ExxonMobil/Quatar Petroleum | three tanks, 155,000 cubic meters | ||
| Milford Haven (Phase I), Wales | Europe | Proposed/Startup 2007 | 331.2 Bcfy | Dragon LNG/BG,Petronas/Petroplus | two tanks, 168,000 cubic meters each | ||
| Milford Haven (Phase II), Wales | Europe | Proposed/Startup 2008-2009 | 365.3 Bcfy | South Hook LNG/ExxonMobil | CB&I (Phase II) | two tanks, 155,000 cubic meters | |
| Milford Haven (Phase II), Wales | Europe | Proposed | Dragon LNG/BG,Petronas,Petroplus | one tank, 168,000 cubic meters each | |||
| ASIA | |||||||
| Guandong, China | Asia | Proposed/Startup 2006-2007 | 158.3 Bcfy | Guangdong LNG (CNOOC, BP) | two tanks, 160,000 cubic meters each | will add third LNG tank for expansion (2008) | |
| Fujian, China | Asia | Proposed/Startup -2007 | 126.6 Bcfy | CNOOC Fujian LNG | CB&I | two tanks, 160,000 cubic meters each | proposed expansion 2010 |
| Quingdao, Shandong China | Asia | Proposed/Startup 2008 | Sinopec | Sinopec won government tender for the site in May 2004 | |||
| Shanghai | Asia | Proposed/Startup 2008 | CNOOC, Shenergy | ||||
| Dabhol, India | Asia | Proposed/2006 (?) | 122 Bcfy | Gail India Ltd, GE, Bechtel | Aker Kvaerner | three tanks, 160,000 cubic meters each | Proposed restart after 2001 shutdown following collapse of Enron |
| Dahej (Gujarat), India | Asia | Existing/2003 | 243.5 Bcfy | Petronet LNG Ltd (IOC, ONGC, GAIL, Bahrat, NTPC, Gaz de France) | two tanks, 320,000 cubic meters, to be reevaluated for additional storage capacity | ||
| Hazira, India | Asia | Existing/2005 | 126.6 Bcfy | Shell, Total | two tanks | Online April 2005, 2.5 million tons per year with goal to expand to 5 mtpy | |
| Kochi, India | Asia | Proposed/Startup -2009 | 121.8 Bcfy | Petronet LNG Ltd | Can reevaluated for additional storage capacity | Construction to start 2005 | |
| West Java, Indonesia | Asia | Proposed/Startup -2007-2008 | 97.4 Bcfy | BP, Pertamina | two tanks, 118,000 cubic meters each | Construction to start 2005 | |
| Chita LNG, Japan | Asia | Existing/1983 | 584 Bcfy | Chita LNG (Chubu Electric, Toho Gas) | seven tanks, 640,000 cubic meters | ||
| Chita Midorihama, Japan | Asia | Existing/2001 | Toho Gas | one tank, 200,000 cubic meters | |||
| Chita, Kyodo, Japan | Asia | Existing/1977 | 387 Bcfy | Chita LNG (Chubu Electric, Toho Gas) | four tanks, 300,000 cubic meters | ||
| Fukuoka, Japan | Asia | Existing/1993 | 31 Bcfy | Saibu Gas | two tanks, 70,000 cubic meters | ||
| Futtsu, Japan | Asia | Existing/1985 | 779 Bcfy | Tokyo Electric | eight tanks, 860,000 cubic meters | ||
| Higashi Niigata, Japan | Asia | Existing/1984 | 830 Bcfy | Tohoku Electric | eight tanks, 720,000 cubic meters | ||
| Hatsukaichi, Japan | Asia | Existing/1996 | 18 Bcfy | Hiroshima Gas | one tank, 170,000 cubic meters | ||
| Higashi Ohgishima, Japan | Asia | Existing/1984 | 714 Bcfy | Tokyo Electric | nine tanks, 540,000 cubic meters | ||
| Himeji Joint, Japan | Asia | Existing/1984 | 195 Bcfy | Osaka Gas, Kansai Electric | seven tanks, 1,440,000 cubic meters | ||
| Himeji, Japan | Asia | Existing/1977 | 402 Bcfy | Osaka Gas | seven tanks, 520,000 cubic meters | ||
| Kagoshima, Japan | Asia | Existing/1996 | 6 Bcfy | Kagoshima Gas | one tanks, 36,000 cubic meters | ||
| Kawagoe, Japan | Asia | Existing/1997 | 374 Bcfy | Chubu Electric | four tanks, 480,000 cubic meters | ||
| Mizushima, Japan | Asia | Proposed/2006 | Chugoku Electric, Mitsubishi | ||||
| Negishi, Japan | Asia | Existing/1969 | 662 Bcfy | Tokyo Gas, Tokyo Electric | sixteen tanks, 1,250,000 cubic meters | ||
| Ohgishima, Japan | Asia | Existing/1998 | 247 Bcfy | Tokyo Gas | three tanks, 600,000 cubic meters | ||
| Ohita, Japan | Asia | Existing/1990 | 247 Bcfy | Ohita LNG (Kyushu Electric, Kyushu Oil, Ohita Gas) | five tanks, 460,000 cubic meters | ||
| Sakai, Japan | Asia | Proposed/2010 | Kansai Electric, Cosmo Oil | ||||
| Senboku I, Japan | Asia | Existing/1972 | 119 Bcfy | Osaka Gas | four tanks, 180,000 cubic meters | ||
| Senboku II, Japan | Asia | Existing/1972 | 636 Bcfy | Osaka Gas | eighteen tanks, 1,510,000 cubic meters | ||
| Shin Minato, Japan | Asia | Existing/1997 | 389 Bcfy | Sendai Gas | one tank, 80,000 cubic meters | Capacity substantially exceeds current contracted supply | |
| Sodegaura, Japan | Asia | Existing/1973 | 1350 Bcfy | Tokyo Electric, Tokyo Gas | thirty-five tanks, 2,660,000 cubic meters | ||
| Sodeshi, Japan | Asia | Existing/1996 | 311 Bcfy | Shimizu LNG (Shizouka Gas) | two tanks, 177,200 cubic meters | Capacity substantially exceeds current contracted supply | |
| Tobata, Japan | Asia | Existing/1997 | 311 Bcfy | Kita Kyushu LNG (Kyushu Electric, Nippon Steel) | eight tanks, 480,000 cubic meters | ||
| Yanai, Japan | Asia | Existing/1990 | 117 Bcfy | Chuboku Electric | six tanks, 480,000 cubic meters | ||
| Yokkaichi LNG Centre, Japan | Asia | Existing/1987 | 428 Bcfy | Toho Gas | four tanks, 320,000 cubic meters | ||
| Yokkaichi Works, Japan | Asia | Existing/1991 | 31 Bcfy | Chubu Electric | two tanks, 160,000 cubic meters | ||
| Mariveles, Bataan, Philippines | Asia | Proposed/Startup -2007-2008 | 68.2 Bcfy | GN Power | |||
| Kwangyang, South Korea | Asia | Existing/2005 | 82.8 Bcfy | POSCO, Mitsubishi, Pohang Iron and Steel | two tanks, 200,000 cubic meters | ||
| Incheon, South Korea | Asia | Existing/1996 | 1090 Bcfy | Kogas | twelve tanks, 1,280,000 cubic meters | ||
| Pyeong Taek, South Korea | Asia | Existing/1986 | 649 Bcfy | Kogas | ten tanks, I,000,000 cubic meters | ||
| Tongeyong, South Korea | Asia | Existing/2002 | 244 Bcfy | Kogas | seven tanks, 980,000 cubic meters | KGE-Engineering | |
| Yung-An, Taiwan | Asia | Existing/1990 | 363 Bcfy | CPC | six tanks, 430,000 cubic meters | Debottlenecked 2001 | |
| New Zealand | Asia | Proposed/Startup -2010-2011 (?) | Contact Energy, Genesis Power | NZ faces energy gap with loss of Maui gas field by 2007, Marsden Point and Taranaki most likely viable sites, Contact and Genesis ready to proceed w/ next phase of development and securing resource consents | |||