FABRIC
FILTER      
NEWSLETTER 

 

August 2006
No. 370

Wheelabrator to Supply Baghouse ACI to Bridgeport Harbor 3

Wheelabrator Air Pollution Control Inc. has been awarded a contract by PSEG Power Connecticut LLC to provide a multi-pollutant control system for 400-MW Bridgeport Harbor Unit 3. The contract has been assumed by Shaw Stone & Webster, who has the engineering, procurement and construction contract for the Mercury Control Project at Bridgeport Harbor. Wheelabrator will design and supply a JET VIP™ fabric filter system to control particulate emissions and a powdered activated carbon injection (ACI) system.

Back to Fabric Filter Newsletter No. 370 Table of Contents