FGD and DeNOx
NEWSLETTER
July 2012
No. 411
FGD
§
Emission Controls Planned for 585-MW Boswell 4§
Kincaid to Retrofit SBC Injection§
Ameren Wants Until 2020 to Meet SO2 Limits§
Weston 3 to Retrofit ReACT§
B. L. England to Convert to Natural Gas-firing§
PJM Determines FirstEnergy Plants Cannot Close Until 2015§
Status of FGD in India§
ERG Delivered Polishing FGD for Ferrybridge Carbon Capture Project§
ADA-ES CyClean System for Cyclone-fired Boilers Firing PRB Coal§
Alabama Power to Connect Gaston to Natural Gas Line§
Scrubber at 800-MW Big Sandy on Hold§
SCE&G Announces Switches to Natural Gas and Power Plant Closures
NO
x§
Dry Scrubber Users 2012 Conference§
GenOn Plans SCR on Gas Turbines and Coal-fired Power Plants§
PMFG to Provide SCR for Fractionation Facility§
Chalk Point Must Primarily Fire Natural Gas§
Nonattainment Areas for 2008 Ozone Standard§
PSEG Starting Up Six Gas Turbines with Four Foot Deep Catalyst Beds§
Studstrupværket 3 and 4 Use SINOx® Plate Catalyst for Replacement
ELECTRIC POWER CONFERENCE
§
Overview§
Nalco’s Mer-Control 8034 Reduces Mercury Re-Emission from Wet FGD Systems§
Both Sonic Horns and Air Cannons for Less Ash Buildup before SCR§
Keep Trona Below 130oF Before Injection to Improve Performance
MERCURY
§
Midwest Energy Emissions’ ME2C Demo at Midwest EGU§
Mer-Cure at 2100-MW Colstrip Operating 2+ Years