World Power Generation Projects
| Project Title |
First Entry Date: 2/1/2001
Revision Date: 8/1/2005
Location: KY near Central City, company's Gibraltar
mine property,Muhlenberg County
Startup Date: 2009
Size: 1500 MW
Primary Fuel: Coal Illinois Basin
Secondary Fuel:
Duct Burner:
Duct Burner Supplier:
Oxidation Catalyst:
Oxidation Catalyst Supplier:
NOx Limit: 0.08 lb/MMBtu (30 day)
CO Limit: 0.1 lb/MMBtu
VOC Limit: 0.0072 lb/MMBtu
PM limit: 0.018 lb/MMBtu
SO2 Limit: 0.167 lb/MMBtu (30 day)
NH3 limit:
Description:
Will incorporate SCR, low NOx burners, wet limestone FGD and dry
and wet ESP and allow the use of Western Kentucky high-sulfur coal. SO2 removal
will be 98 percent with an emission of 0.167 lb/MMBtu. NOx emissions will be
0.08 lb/MMBtu. (Both of these limits are below those proposed in Clear
Skies--SO2 0.25, NOx 0.14). Some concerns about impact on Mammouth Cave. Has
received pre-approval for the air quality permit. 2/02 Environmentalists still
question impact on Mammouth Cave. Has signed letter of intent with EPC and still
negotiating.10/02 Peabody continues to seek permits despite lawsuits filed to
stop construction. 7/03 Has completed its application. The siting board approved
construction. 12/03 Has air permit. Delayed unitl mid-2005 due to permitting
issues. Appeal of permit does not preclude the company from beginning
construction. 3/05 Another lawsuit filed in regard to Mammoth Cave National
Park. 8/05 Permit remanded back to KY DAQ.
|
Contractor |
Contractor Comment |
| Alstom | build |
| Peabody | developer |
| United Engineers & Constructors | build |
| Zachry Construction | build |
| Burns & McDonnell | owner's engineer |
| NOx Control Type | Supplier |
| SCR |