World Power Generation Projects

Project Title

     First Entry Date:  
     Revision Date: 6/1/2002

                 Location: CT   Oxford
                 Startup Date: Delayed
                 Size: 540  MW
                 Primary Fuel: Gas    
                 Secondary Fuel: Oil
                 Duct Burner:      
                 Duct Burner Supplier:  
                 Oxidation Catalyst:      
                 Oxidation Catalyst Supplier:
  
                 NOx Limit: 2 ppm NG, 5.9 ppm FO           
                 CO Limit:
  
                 VOC Limit:             
                 PM limit:
  
                 SO2 Limit:              
                 NH3 limit:  

          Description:


Contractor 

Contractor Comment

Burns & Roe design and engineer
Calpine build
General Electric turbines
NOx Control Type Supplier
SCR