World Power Generation Projects

Project Title

     First Entry Date:  
     Revision Date: 1/1/2004

                 Location: FL    
                 Startup Date: 2002
                 Size: 860  MW additional
                 Primary Fuel: Gas    
                 Secondary Fuel:  
                 Duct Burner:      
                 Duct Burner Supplier:  
                 Oxidation Catalyst:      
                 Oxidation Catalyst Supplier:
  
                 NOx Limit: 9 ppm           
                 CO Limit:
 12 ppm
                 VOC Limit: 1.4 ppm           
                 PM limit:
  
                 SO2 Limit:              
                 NH3 limit:  

          Description:
         
 Repower from 540 MW to 1400 MW


Contractor 

Contractor Comment

Foster Wheeler heat recovery steam generators
General Electric turbines
Black & Veatch management services
NOx Control Type Supplier
Low NOx Combustors