Internal Data Search by Location

Data Search on:

Sargent & Lundy Turns to Fisher Sever Service Group for Sky Vent Solution that Reduces Noise, Vibration and Costs

This case study describes a sky vent solution for a heat recovery steam generator (HRSG) which addresses noise and vibration concerns at a combined cycle power plant in Texas. The solution incorporated a whisper Trim III noise attenuating flow cage along with a downstream diffuser.

Revision Date:  9/8/2014

Tags:  221112 - Fossil Fuel 化石燃料, Emerson Process Management, Sargent & Lundy, Heat Recovery Steam Generator, Control Valve, Valve, Noise, Vibration, USA


Environmental Assessment of the Proposed Jack County (TX) Power Plant Expansion Project

Brazos Electric Power is proposing a 600 MW natural gas-combined cycle expansion of its existing 600 MW CCGT power plant in Jack County, Texas. This environmental assessment was used to determine whether additional documentation was required (e.g., an Environmental Impact Statement (EIS) under NEPA or if the project may proceed due to a Finding of No Significant Impact (FONSI)).

Revision Date:  5/10/2014

Tags:  221112 - Fossil Fuel 化石燃料, Environmental Impact, CO, NOx, Ammonia, Permitting, USA