Internal Data Search by Location
Continuous-Blowdown Block Valve Reduces Startup Time
At Essential Power LLC’s Newington Energy Facility, the high-pressure (HP) steam-drum continuous blowdown system was designed to cascade flow to the intermediate-pressure (IP) steam drum. While the valve worked well for controlling flow, it did not have the degree of leak-tightness required for stopping flow from the drum during typical overnight shutdowns. An automatic full-port ball valve was installed upstream from the existing automatic control valve to eliminate the risk of flashing.
Revision Date: 5/28/2015
Tags: 221112 - Fossil Fuel 化石燃料, Valve, Leakage, Combined Cycle Journal, USA