A major chemical manufacturer required a pollution control system with minimal operational cost to destroy the Hazardous Air Pollutant (HAP) by-products of a formaldehyde production process. A key issue was system reliability; the plant operates 24 hours a day and only shuts down once per year for plant-wide preventive maintenance. Click Here For Complete Case Study Text
|
|||||||||||||||||||||||||||
Application Sequencing | |||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||
Company | Product | Process | Other Subjects | Event | Event Date | Location | Publication | Publication Date | Text Descriptor | ||||||||||||||||||
|
|
|
|
|
|
|
|
|
|