• In the Permian basin a Major operator suffered early (conventional) ESP failure due to sand erosion / pump plugged with frac sand. • Well was known to be high sand. It was replace with the V-Pump which has operated trouble-free for more than one year. • The V-Pump continues to operate in high gas fraction conditions. As minor sand bridges occur (2 x daily) the pump washes them away by pulling 50 – 150psi additional drawdown. Click Here For Complete Case Study Text
|
|||||||||||||||||||||||||||
Application Sequencing | |||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||
Company | Product | Process | Other Subjects | Event | Event Date | Location | Publication | Publication Date | Text Descriptor | ||||||||||||||||||
|
|
|
|
|
|
|
|
|