Title: Turbo blower and two existing PD blowers provide cost savings

Tim McCurdy of Aerzen writing in Blower & Vacuum Best Practices explains three blower technologies and, using examples from actual wastewater plants, describes the most effective technology for particular applications and why. The plant selected the Aerzen AT 100 turbo blower. The new turbo blower serves as a base load generator for process air, operating at a capacity range from 35 to 80 cubic meters per minute (1200 to 2800 SCFM). The two existing PD blowers are connected to the new system and automatically start when needed to handle peak loads or serve as redundant blowers. Adding the new turbo blower resulted in cost savings on the order of 20% to 25%.

Click Here For Complete Article Text

 