Tom Daft of Mid American presented the program focused on keeping wind turbines safe and reliable. There are procedures for the following • Main Tower AC Tower Breaker • 575 VAC to LVMD; Control Control Voltage Voltage • 50 kVa Transformer • Converter • Pitch Slip Ring • Gearbox Lubrication Pump • Gear Box Cooler Fan • Yaw Drive System • Hydraulic Brake Unit And 10 other systems… Click Here For Complete Article Text
|
||||||||||||||||||
Application Sequencing | ||||||||||||||||||
|
||||||||||||||||||
Company | Product | Process | Other Subjects | Event | Event Date | Location | Publication | Publication Date | Text Descriptor | |||||||||
|
|
|
|
|
|
|
|
|