Title: Portland Cement MACT Regulations Frequently‐Asked Questions (FAQs) - Cement MACT Webinar February 9, 2011

Karl Wilber, PE, General Manager of Tekran Instruments, identified the specific challenges facing the Portland Cement Industry as they further develop their strategies in response to EPA's MACT regulations. The presentation included emissions limits and CEM parameters which are integral to MACT compliance, with focus on mercury (Hg). Tekran shared their experiences in the cement, power, steel and incineration processes. The company has supplied a number of mercury CEMS to the power industry and is presently quite active in the cement industry. Because of its work with analyzers on a broader basis, it has an understanding of the fate of mercury. This is important because removal from the air is only the first step. Prevention of mercury problems in soil and water are equally important. Another need is to use the mercury CEM as a control device to regulate the quantity of sorbent injection. This will dictate a measurement both before and after the control device. Because of the large difference in range to be measured and other factors, it is probably best to install a separate analyzer rather than to use two sample lines and one analyzer.

Click Here For Complete Presentation Text

 

   Person Information
  •     Wilber, Karl  -  Tekran Instruments

   Application Sequencing
 327310 - Cement Manufacturing 水泥生产                
Company  Product  Process  Other  Subjects  Event  Event  Date  Location  Publication  Publication  Date Text  Descriptor
  • Tekran Instruments

  • CEM

  • Mercury

 

  • Air Quality

  • Legislation

  • Hot Topic Hour

 

  • 2/9/2011

 

 

 

 

  • Presentation