The City of Tallahassee plans to repower a 230MW oil-fired steam generator to combined cycle by adding two F-class gas turbines and heat recovery steam generators (HRSGs) in a 2+2+1 configuration. Phase 1 was completed in 2008 and involved the first of the gas turbines. This article discusses the equipment and controls used for the project. Click Here For Complete Case Study Text
|
||||||||||||||||||