Berkshire Hathaway Energy

Alert #4, November 1, 2016

 

Linkedin Discussion Groups

 

McIlvaine is setting up a number of Linkedin decision groups covering the range of products and services utilized by BHE.  These decision groups are open to any power plant operator and to McIlvaine subscribers.  Many of the subjects are ones which are currently of high importance to BHE. The purpose of the groups is to complement the information appearing in the Alerts, newsletters, webinars and databases.  The groups provide you with an easy way to ask questions and to receive specific answers.  There will be dozens of groups launched in the coming months. Here are the ones which are active now:

 

Flue gas desulfurization

Coal-fired power plant instrumentation and controls

Coal combustion residues and wastewater emissions

Dry Scrubbing

HRSG Valve Decisions

NOx Scrubbing

To join any group go to google and type in Linkedin then the subject and then group e.g.  Linkedin Nox Scrubbing Group.

 

Information about the Hunter and Huntington Nox options appear in a number of the groups.  There is even a NOx scrubbing group.  The Flue gas desulfurization group includes a discussion of the impact of ozone on SO2 removal. The dry scrubbing group will evaluate filter media issues with H202/urea injection in the boiler.

 

Linkedin NOx Scrubbing Group

This group consists of NOx generators, McIlvaine subscribers and selected experts or contributors. It covers coal-fired power, incineration, chemical, refining and other industries generating NOx.

Should coal-fired boiler scrubbers remove NOx?

SCR and SNCR are proven methods for NOx removal but there are situations where a relatively small amount of NOx needs to be removed and there are existing scrubbers. Ozone can be used for oxidizing NOx to NO2 and then N205. Refineries are using ozone ahead of scrubbers. Why shouldn't the power industry consider its utilities in Utah, Alabama and Mississippi that have suddenly been required to remove more NOx. A detailed analysis of this option is being pursued on a special website set up for BHE. Insights from this Linkedin group will be conveyed to the BHE subscribers.
One major question is whether to use peroxide instead of just ozone ahead of the scrubbers.

Robert McIlvaine -  
Refineries are using ozone instead of SCR. There is the assumption that Ozone scrubbing is too expensive. If so why are refineries using it? Is it a question of the quantity of NOx to be removed? If so then those power plants which only need to remove another 0.06 lbs/mm btu are more likely candidates than those who need to remove 0.2 lbs/mm btu or more.

Where is NO2 being absorbed in plate or packed towers?

 

Robert McIlvaine -  
Conversion of NO to NO2 - (Envitec) One tray is used in the case there is a sufficiently high concentration of NO in the inlet gas stream or sufficiently low outlet concentration limit for NO. NO is essentially insoluble in water, but it can be quickly oxidized to NO2 by chlorine dioxide (ClO2) or ozone (O3). This can be done using a packed bed, but the reaction of NO actually occurs in the gas phase. The packed bed functions as a ClO2 generator and static mixer, or as a static mixer for ozone injected in the form of an aqueous solution. ClO2 can be generated by the reaction of sodium chlorite (NaClO2) with a strong acid. Sulfuric acid (H2SO4) is commonly used, but if the air being scrubbed contains enough nitric acid fumes, it may not be necessary to add much H2SO4. Most NOx scrubbers don't have an oxidation stage. When NOx is generated by the reaction of nitric acid with metals, it usually consists mainly of NO2. NO is invisible, and it is much less toxic than NO2.

Robert McIlvaine – 
The Mt. Vernon, IN plant of GE Plastics has installed a NOx scrubber. When such GE Plastics products as Ultem resins are produced, nitric acid is used, and emissions from this step are tightly controlled. But to address upset conditions, the company opted to install an emergency scrubber that can treat up to 66,000 ft3/min of air containing 9,600 ppm nitric acid vapor and 1,100 ppm of NO2 for 1h. To meet this need, Tri-Mer Corp. has successfully adapted the design of its continuous-duty NOx The Tri-Mer system used at Mt. Vernon comprises two horizontal scrubbing stages, with each stage having its own circulation system. A proprietary combination of caustic, sodium hypochorite and a reducing agent is used.

 

Robert McIlvaine -  

The Kanto Denka process (1) employs a scrubbing solution containing 0.2% hydrogen peroxide and 10% nitric acid while the Nikon process uses a 10% sodium hydroxide solution containing 3.5% hydrogen peroxide. A fourth process, the Ozawa process, scrubs NOx by spraying a hydrogen peroxide solution into the exhaust gas stream. The liquid is then separated from the gas stream, and the nitric acid formed is neutralized with potassium hydroxide. The excess potassium nitrate is crystallized out, and the solution reused after recharging with hydrogen.

 

Member coordination between component and system suppliers

Belco and Xylem are participating. Let’s discuss potential beyond refineries to other applications but also ozone in conjunction with other technologies. Any comments on both subjects?

Robert McIlvaine -  
Belco Lotox : Marathon conducted a review of several options to reduce nitrogen oxides (NOx) from its 52,000 barrels per day FCCU. The LoTOx technology was identified as a potential NOx control technology. Unfortunately, the LoTOx technology had never been used on an FCCU. Marathon needed more assurance that applying it to an FCCU would result in similar performance to that experienced in the other application. To that end, Marathon, BOC and Belco conducted a demonstration of Belco’s EDV wet scrubbing system with LoTOx technology. The demonstration was conducted October through November 2002. Following review of the results, Belco finalized its proposal to Marathon for the system and eventually concluded negotiations for the design and supply of the system for the Texas City refinery. This commercial system successfully started operating in February 2007, achieving all established goals and confirming the results of the demonstration

Linkedin Flue Gas Desulfurization Group

Flue gas desulfurization

Power plants generate SO2 which can be captured and converted to disposable products or usable byproducts such as gypsum, sulfuric acid, or ammonium sulfate fertilizer. The choice for an individual plant is affected by many factors. There are 1000s of components in these systems. The corrosive and abrasive environment dictates careful selection of components as well as special operation and maintenance practices. Discussions of all of this are encouraged.

 

What are the impacts on the scrubber when ozone is injected ahead of the scrubber for purposes of NOx capture

 

Robert McIlvaine - 
Ozone injection creates NO2 and N205. The N205 is more readily absorbed in the scrubber. NO2 is also absorbed but at lower efficiency rates. Shiaw Tseng of Graymont believes that there are concerns about some of the reactions which can take place. We are asking Shiaw to elaborate on this.

Is DSI -catalytic filtration ready for prime time

Direct sorbent injection followed by catalytic filtration is being successfully used in hundreds of glass, incineration, and other plants. It has yet to be installed on a large coal-fired boiler. Because of the big reduction in capital cost by reducing three vessels to just one it is time for serious consideration of this option. What are the imitations and how do we move forward?

Robert McIlvaine - 
One of the problems is the fact that the ceramic catalytic filter elements are only 3 meters long. The FLS catalytic filter element with fiberglass media can be supplied with 10 meter long bags. A large installation is now successfully operating on a cement kiln in Europe. How about more details?

Robert McIlvaine - 
Lhoist has launched a worldwide program to provide an improved hydrated lime which has expanded surface area and the high reactivity needed for DSI. The cost of the lime will be a critical factor in deciding whether to invest more capital or use a higher operating cost approach. We need some Lhoist examples comparing the capital cost saving to the increased operational cost.

The HRSG valve group is discussing the important reduction in total cost of ownership.  This should be interesting to BHE procurement for global specifying and TCO analyses.

 

HRSG Valve Decisions

Review selection and repair of valves used in the heat recovery steam generation systems associated with gas turbine combined cycle power plants. This group is for any HRSG operator, McIlvaine Subscribers, and selected contributors. The group will be providing analysis for McIlvaine Power Plant Valve Decisions, this includes the ultrapure water, steam cycle, and condensate. It addresses the problems associated with frequent cycling including both performance and maintenance. The emphasis is on determining the lowest total cost of ownership (TCO) approach. In a number of severe service applications a more expensive repairable valve may provide the lowest TCO.

What are the most significant HRSG valve problems?

 

Robert McIlvaine -  
McIlvaine conducted a 90 minute webinar on GTCC valve decisions and options. A large number of issues and some solutions are provided. Additional comments are encouraged. The recording and the power points are found in GTRE Decisions. The 80 slide power point presentation is also posted in the free Global Decisions Orchard
http://www.mcilvainecompany.com/Decision_Tree/2015%20WEBINARS/June%202015/GTCC%20Valves%20Decision%20Guide%20by%20Bob%20McIlvaine.pdf

What are the challenges when you bypass steam around the turbine at startup?

During initial operation of the HRSG, valves are needed to bypass steam (HP/HRH/LP) around the steam turbine to ensure that the unit doesn't come up to temperature too quickly. The large pressure differential across the valve can cause high noise levels that need to be attenuated. Other challenges are high temperature, valve leakage and need for fast operation. What is the solution?

Emerson provides Sky Vent engineered systems with proper valve and controller selection. To reduce the noise potential, the pressure drop is split between the valve and a downstream diffuser or silencer. The pressure split also serves to optimize the size of each component. The details on the Sky Vent are included in the GTRE Decisions Intelligence system but are also included in the Free McIlvaine Global Decisions Orchard
http://www.mcilvainecompany.com/Decision_Tree/subscriber/Tree/DescriptionTextLinks/Fisher%20bypass%20valve%20system.pdf


Is stellite delamination still a problem?

NV Energy Higgins station any other HRSG owners are experiencing stellite liberation from high-pressure (HP) and hot reheat (HRH) valves serving in F-class combined cycles. Tight shutoff of parallel-slide gate and non-return globe valves has been compromised in some cases. This is an industry-wide problem and something NV Energy is dealing with at Higgins and other plants. EPRI has established a committee on “Cracking and Disbonding of Hardfacing Alloys in Combined-Cycle Plant Valves. 4 NV Energy people participated in discussions on this at a user group meeting. We will contact them for updates.

 

GTRE Decisions has lots of details on BHE pipelines and compressor stations

Very detailed information on turbines and engines used in existing and pending pipelines is included in the GTRE Decisions.  If you click on Title you see all entries chronologically starting with the most recent.  You can also search by key words.  The excerpts below include the key words which were used.

Natural Gas Pipeline Technology Overview

The pipeline transmission system — the “interstate highway” for natural gas — consists of 180,000 miles of high-strength steel pipe varying in diameter, normally between 30 and 36 inches in diameter. The primary function of the transmission pipeline company is to move huge amounts of natural gas thousands of miles from producing regions to local natural gas utility delivery points. These delivery points, called “city gate stations,” are usually owned by distribution companies, although some are owned by transmission companies. Compressor stations at required distances boost the pressure that is lost through friction as the gas moves through the steel pipes (EPA 2000).

Revision Date:  10/25/2016

Tags:  211111 - Crude Petroleum and Natural Gas Extraction 原油和天然气开采, Argonne National Laboratory, Compressor Stations, Pipeline, Steel Pipe, Compression, Transmission, Pipeline, USA.

Northern Lights, Owatonna Compressor Station, Air Emissions Permit

The Owatonna Compressor Station is used to pressurize natural gas in order to facilitate its transmission through a pipeline system. The facility consists of a 16,000 BHP natural gas-fired turbine and one emergency generator. The facility is subject to a New Source Performance Standard for the turbine, and therefore requires a permit.

Revision Date:  10/21/2016

Tags:  211111 - Crude Petroleum and Natural Gas Extraction 原油和天然气开采, Northern Natural Gas Co, Generator, Gas Turbine, Pipeline, Compressor Stations, Pipeline, Compression, Permitting, Gas-fired, USA

Northern Lights, North Branch Compressor Station, Air Emissions Permit

Northern Natural Gas Company operates a compressor station in North Branch to pressurize natural gas in order to facilitate its transmission through the pipeline system. The facility was built in 1966. The North Branch facility consists of four (4) natural gas-fired reciprocating engines to drive the pipeline natural gas compressors (all four are Worthington ML-7 2-stroke lean burn engines rated at 2,000 horsepower), a diesel-fired emergency generator (a Kohler D300 engine rated at 462 horsepower), and a natural gas fired boiler rated at 3.35 MMBtu/hr. The compressors pressurize the natural gas in the pipeline causing it to flow to the next compressor station. The primary emissions are nitrogen oxides (NOx) and greenhouse gasses (CO2e) from the reciprocating engines. Emissions are not controlled. The facility also has equipment that qualifies as insignificant activities under Minn. R. 7007.1300, subparagraphs 3 and 4. This permit is a reissuance of the Title V operating permit. In this permit, EU 005 (the natural gas-fired auxiliary generator engine) has been removed from the list of permitted facilities. Federal NESHAP requirements for the emergency generator and the boiler have been added.

Revision Date:  10/21/2016

Tags:  211111 - Crude Petroleum and Natural Gas Extraction 原油和天然气开采, Northern Natural Gas Co, Compressor Stations, Engine, Generator, Gas Turbine, Permitting, Compression, Pipeline, Gas-fired, USA.

Northern Lights, Hugo Compressor Station, Air Emissions Permit

The facility will use a 7229 hp natural gas-fired turbine to compress natural gas in a pipeline. The facility will operate an emergency generator as a backup for electrical power. Uncontrolled emissions from the facility are less than the thresholds for all criteria pollutants. However, the natural gas-fired turbine is subject to 40 CFR pt. 60, subp. GG and the Permittee will therefore receive a state operating permit.

Revision Date:  10/21/2016

Tags:  211111 - Crude Petroleum and Natural Gas Extraction 原油和天然气开采, Northern Natural Gas Co, Compressor Stations, Gas Turbine, Pipeline, Generator, Pipeline, Permitting, Gas-fired, Compression, USA.

Northern Lights, Albert Lea Compressor Station, Air Emissions Permit

Northern Natural Gas -Albert Lea is a natural gas compressor station. The facility operates a 119 MM Btu (15,596 hp) natural gas fired turbine (EU 001), used to compress natural gas in a pipeline. The turbine is subject to 40 CFR pt. 60, subpart KKKK. The facility also has a 4.37 MM Btu (619 hp) diesel emergency generator (EU 002) to power the turbine during power outages. The generator is subject to 40 CFR pt. 60, subpart 1111. The engine is a 2007 model year or later with a displacement less than 10 liters per cylinder.

Revision Date:  10/21/2016

Tags:  211111 - Crude Petroleum and Natural Gas Extraction 原油和天然气开采, Northern Natural Gas Co, Compressor Stations, Gas Turbine, Generator, Pipeline, Gas-fired, Pipeline, Compression, Permitting, USA.

Northern Lights, Farmington Compressor Station, Air Emissions Permit

The Farmington Compressor Station is used to pressurize natural gas for transport through the pipeline system. The facility is composed of a compressor building which houses five natural gas-fired reciprocating compressor engines and a natural gas-fired turbine that provide power to the pipeline compressor. There is also a diesel-fired electric generator for emergency power.

Revision Date:  10/20/2016

Tags:  211111 - Crude Petroleum and Natural Gas Extraction 原油和天然气开采, Gas Turbine, Engine, Generator, Compressor Stations, Pipeline, Gas-fired, Permitting, Pipeline, Compression, USA.

Northern Lights, Faribault Compressor Station, Air Emissions Permit

The Faribault Compressor Station consists of one 16,000 braking horsepower (BHP) natural gas turbine and one emergency generator. The turbine is subject to 40 CFR pt. 60, subp. GG. The facility is considered not considered to be a major source under any air quality permitting regulations. The modification authorized by this amendment is to remove the 10,600 BHP limit on the natural gas turbine to allow operation of the turbine at full capacity of 16,000 BHP.

Revision Date:  10/20/2016

Tags:  211111 - Crude Petroleum and Natural Gas Extraction 原油和天然气开采, Northern Natural Gas Co, Compressor, Pipeline, Engine, Gas Turbine, Generator, Modification, Construction, Gas-fired, Permitting, Pipeline, Compression, USA.

Apex Expansion Project, Final Environmental Impact Statement

The purpose of the Apex Expansion Project is to transport an additional 266 million cubic feet per day (MMcf/d) of natural gas on Kern River’s existing pipeline system from southwestern Wyoming to Nevada. Dependent upon Commission approval, Kern River proposes to begin construction in the fall 2010 and place the facilities into operation in November 2011. Kern River proposes to construct and operate: • approximately 27.6 miles of 36 – inch – diameter natural gas transmission pipeline loop extending southwest in Utah from Morgan County through Davis County to Salt Lake County • one new 30,000 horsepower compressor station (known as Milford Compressor Station) in Beaver County, Utah; • modifications to four existing compressor stations to add additional compressor (the Coyote creek Compressor Station located in Uinta County, Wyoming; the Elberta Compressor Station located in Utah County; and the Dry Lake Compressor Station located in Clark County, Nevada); six mainline valves (four new and two existing that require modifications;) and  three pig launcher and two pig receiver facilities.

Revision Date:  10/19/2016

Tags:  211111 - Crude Petroleum and Natural Gas Extraction 原油和天然气开采, Kern River Gas Transmission Co, Valves, Pipeline, Compressor Stations, Gas Turbine, Pipeline, Modification, Compression, Permitting, USA.

 